Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Sarolangun
No | Nama Material | Jenis | Sumber | Satuan | Harga |
---|---|---|---|---|---|
1 | Kusen & pintu PVC (kamar mandi) | Maspiom ZONA I | SSH Kab. Sarolangun 2024 | Unit | 500.000 |
2 | Kusen & Pintu almunium (kamar mandi) | Alexindo ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 1.235.000 |
3 | Kusen & Pintu almunium (kamar mandi) | Alexindo ZONA III | SSH Kab. Sarolangun 2024 | Unit | 1.185.000 |
4 | Kusen & Pintu almunium (kamar mandi) | Alexindo ZONA II | SSH Kab. Sarolangun 2024 | Unit | 1.135.000 |
5 | Kusen & Pintu almunium (kamar mandi) | Alexindo ZONA I | SSH Kab. Sarolangun 2024 | Unit | 1.035.000 |
6 | Rangka pintu almunium | Alexindo ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 264.000 |
7 | Rangka pintu almunium | Alexindo ZONA III | SSH Kab. Sarolangun 2024 | Meter | 252.000 |
8 | Rangka pintu almunium | Alexindo ZONA II | SSH Kab. Sarolangun 2024 | Meter | 240.000 |
9 | Rangka pintu almunium | Alexindo ZONA I | SSH Kab. Sarolangun 2024 | Meter | 230.000 |
10 | Rangka jendela almunium | Alexindo ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 124.000 |
11 | Rangka jendela almunium | Alexindo ZONA III | SSH Kab. Sarolangun 2024 | Meter | 115.000 |
12 | Rangka jendela almunium | Alexindo ZONA II | SSH Kab. Sarolangun 2024 | Meter | 107.000 |
13 | Rangka jendela almunium | Alexindo ZONA I | SSH Kab. Sarolangun 2024 | Meter | 102.000 |
14 | Kusen almunium | 3" Alexindo ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 172.000 |
15 | Kusen almunium | 3" Alexindo ZONA III | SSH Kab. Sarolangun 2024 | Meter | 160.000 |
16 | Kusen almunium | 3" Alexindo ZONA II | SSH Kab. Sarolangun 2024 | Meter | 148.000 |
17 | Kusen almunium | 3" Alexindo ZONA I | SSH Kab. Sarolangun 2024 | Meter | 141.000 |
18 | Cerucuk/ Gelam dia 8 s/d 10 cm | p. 4 m ZONA IV | SSH Kab. Sarolangun 2024 | Batang | 57.000 |
19 | Cerucuk/ Gelam dia 8 s/d 10 cm | p. 4 m ZONA III | SSH Kab. Sarolangun 2024 | Batang | 57.000 |
20 | Cerucuk/ Gelam dia 8 s/d 10 cm | p. 4 m ZONA II | SSH Kab. Sarolangun 2024 | Batang | 57.000 |
21 | Cerucuk/ Gelam dia 8 s/d 10 cm | p. 4 m ZONA I | SSH Kab. Sarolangun 2024 | Batang | 57.000 |
22 | Kayu klas III | ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 3.350.000 |
23 | Kayu klas III | ZONA III | SSH Kab. Sarolangun 2024 | M3 | 3.350.000 |
24 | Kayu klas III | ZONA II | SSH Kab. Sarolangun 2024 | M3 | 3.350.000 |
25 | Kayu klas III | ZONA I | SSH Kab. Sarolangun 2024 | M3 | 3.350.000 |
26 | Kayu klas II | Meranti, medang batu ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 4.950.000 |
27 | Kayu klas II | Meranti, medang batu ZONA III | SSH Kab. Sarolangun 2024 | M3 | 4.950.000 |
28 | Kayu klas II | Meranti, medang batu ZONA II | SSH Kab. Sarolangun 2024 | M3 | 4.950.000 |
29 | Kayu klas II | Meranti, medang batu ZONA I | SSH Kab. Sarolangun 2024 | M3 | 4.950.000 |
30 | Kayu klas I | Kolim, Tembesu ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 6.650.000 |
31 | Kayu klas I | Kolim, Tembesu ZONA III | SSH Kab. Sarolangun 2024 | M3 | 6.650.000 |
32 | Kayu klas I | Kolim, Tembesu ZONA II | SSH Kab. Sarolangun 2024 | M3 | 6.650.000 |
33 | Kayu klas I | Kolim, Tembesu ZONA I | SSH Kab. Sarolangun 2024 | M3 | 6.650.000 |
34 | Rolling door 0,4 mm (besi) | ZONA IV | SSH Kab. Sarolangun 2024 | M2 | 1.100.000 |
35 | Rolling door 0,4 mm (besi) | ZONA III | SSH Kab. Sarolangun 2024 | M2 | 1.050.000 |
36 | Rolling door 0,4 mm (besi) | ZONA II | SSH Kab. Sarolangun 2024 | M2 | 1.000.000 |
37 | Rolling door 0,4 mm (besi) | ZONA I | SSH Kab. Sarolangun 2024 | M2 | 950.000 |
38 | Pintu Air Uk. L 0,50 m H 0,60 m | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 7.000.000 |
39 | Pintu Air Uk. L 0,50 m H 0,60 m | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 6.500.000 |
40 | Pintu Air Uk. L 0,50 m H 0,60 m | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 6.300.000 |
41 | Pintu Air Uk. L 0,50 m H 0,60 m | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 6.000.000 |
42 | Pintu Air Uk. L 0,60 m H 0,80 m | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 9.000.000 |
43 | Pintu Air Uk. L 0,60 m H 0,80 m | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 8.500.000 |
44 | Pintu Air Uk. L 0,60 m H 0,80 m | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 8.300.000 |
45 | Pintu Air Uk. L 0,60 m H 0,80 m | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 8.000.000 |
46 | Pintu Air Uk. L 0,80 m H 1,60 m | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 15.000.000 |
47 | Pintu Air Uk. L 0,80 m H 1,60 m | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 14.500.000 |
48 | Pintu Air Uk. L 0,80 m H 1,60 m | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 14.300.000 |
49 | Pintu Air Uk. L 0,80 m H 1,60 m | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 14.000.000 |
50 | Pintu Air Uk. L 0,90 m H 1,60 m | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 16.000.000 |
51 | Pintu Air Uk. L 0,90 m H 1,60 m | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 15.500.000 |
52 | Pintu Air Uk. L 0,90 m H 1,60 m | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 15.300.000 |
53 | Pintu Air Uk. L 0,90 m H 1,60 m | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 15.000.000 |
54 | Pintu Air Uk. L 1 m H 1,60 m | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 18.000.000 |
55 | Pintu Air Uk. L 1 m H 1,60 m | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 17.500.000 |
56 | Pintu Air Uk. L 1 m H 1,60 m | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 17.300.000 |
57 | Pintu Air Uk. L 1 m H 1,60 m | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 17.000.000 |
58 | Pintu AirType Tersier (k. 0,6 x 1,0 x 1,5 M) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 4.600.000 |
59 | Pintu AirType Tersier (k. 0,6 x 1,0 x 1,5 M) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 4.500.000 |
60 | Pintu AirType Tersier (k. 0,6 x 1,0 x 1,5 M) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 4.400.000 |
61 | Pintu AirType Tersier (k. 0,6 x 1,0 x 1,5 M) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 4.300.000 |
62 | Pintu Air Type C (As Single pakai gigi uk. 1,0 x 1,5 x 4,0 M) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 16.550.000 |
63 | Pintu Air Type C (As Single pakai gigi uk. 1,0 x 1,5 x 4,0 M) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 16.450.000 |
64 | Pintu Air Type C (As Single pakai gigi uk. 1,0 x 1,5 x 4,0 M) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 16.350.000 |
65 | Pintu Air Type C (As Single pakai gigi uk. 1,0 x 1,5 x 4,0 M) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 16.250.000 |
66 | Pintu Air Type B (As Single pakai gigi uk. 1,0 x 1,5 x 4,0 M) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 20.300.000 |
67 | Pintu Air Type B (As Single pakai gigi uk. 1,0 x 1,5 x 4,0 M) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 20.200.000 |
68 | Pintu Air Type B (As Single pakai gigi uk. 1,0 x 1,5 x 4,0 M) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 20.100.000 |
69 | Pintu Air Type B (As Single pakai gigi uk. 1,0 x 1,5 x 4,0 M) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 20.000.000 |
70 | Pintu Air Type A4 (As Double pakai gigi uk. 1,5 x 2,0 x 10,0 M) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 73.500.000 |
71 | Pintu Air Type A4 (As Double pakai gigi uk. 1,5 x 2,0 x 10,0 M) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 73.400.000 |
72 | Pintu Air Type A4 (As Double pakai gigi uk. 1,5 x 2,0 x 10,0 M) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 73.300.000 |
73 | Pintu Air Type A4 (As Double pakai gigi uk. 1,5 x 2,0 x 10,0 M) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 73.200.000 |
74 | Pintu Air Type A3 (As Double pakai gigi uk. 1,5 x 2,0 x 8,0 M) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 68.300.000 |
75 | Pintu Air Type A3 (As Double pakai gigi uk. 1,5 x 2,0 x 8,0 M) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 68.200.000 |
76 | Pintu Air Type A3 (As Double pakai gigi uk. 1,5 x 2,0 x 8,0 M) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 68.100.000 |
77 | Pintu Air Type A3 (As Double pakai gigi uk. 1,5 x 2,0 x 8,0 M) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 68.000.000 |
78 | Pintu Air Type A2 (As Double pakai gigi uk. 1,5 x 2,0 x 5,0 M) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 40.500.000 |
79 | Pintu Air Type A2 (As Double pakai gigi uk. 1,5 x 2,0 x 5,0 M) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 40.400.000 |
80 | Pintu Air Type A2 (As Double pakai gigi uk. 1,5 x 2,0 x 5,0 M) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 40.300.000 |
81 | Pintu Air Type A2 (As Double pakai gigi uk. 1,5 x 2,0 x 5,0 M) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 40.200.000 |
82 | Pintu Air Type A1 (As Double pakai gigi uk. 1,5 x 2,0 x 4,5 M) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 37.800.000 |
83 | Pintu Air Type A1 (As Double pakai gigi uk. 1,5 x 2,0 x 4,5 M) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 37.700.000 |
84 | Pintu Air Type A1 (As Double pakai gigi uk. 1,5 x 2,0 x 4,5 M) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 37.600.000 |
85 | Pintu Air Type A1 (As Double pakai gigi uk. 1,5 x 2,0 x 4,5 M) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 37.500.000 |
86 | Klem Sling Jembatan Gantung D.1/2" | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 11.000 |
87 | Klem Sling Jembatan Gantung D.1/2" | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 10.000 |
88 | Klem Sling Jembatan Gantung D.1/2" | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 9.000 |
89 | Klem Sling Jembatan Gantung D.1/2" | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 8.500 |
90 | Klem Sling Jembatan Gantung D.3/4" | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 85.000 |
91 | Klem Sling Jembatan Gantung D.3/4" | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 74.000 |
92 | Klem Sling Jembatan Gantung D.3/4" | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 65.000 |
93 | Klem Sling Jembatan Gantung D.3/4" | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 58.000 |
94 | Klem Sling Jembatan Gantung D.1" | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 575.000 |
95 | Klem Sling Jembatan Gantung D.1" | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 525.000 |
96 | Klem Sling Jembatan Gantung D.1" | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 475.000 |
97 | Klem Sling Jembatan Gantung D.1" | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 425.000 |
98 | Klem Sling Jembatan Gantung D.1.1/4" | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 579.000 |
99 | Klem Sling Jembatan Gantung D.1.1/4" | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 529.000 |
100 | Klem Sling Jembatan Gantung D.1.1/4" | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 479.000 |
101 | Klem Sling Jembatan Gantung D.1.1/4" | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 429.000 |
102 | Klem Sling Jembatan Gantung D.1.1/2" | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 675.000 |
103 | Klem Sling Jembatan Gantung D.1.1/2" | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 625.000 |
104 | Klem Sling Jembatan Gantung D.1.1/2" | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 575.000 |
105 | Klem Sling Jembatan Gantung D.1.1/2" | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 525.000 |
106 | Kawat Sling Jembatan Gantung D. 1/2" | ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 40.000 |
107 | Kawat Sling Jembatan Gantung D. 1/2" | ZONA III | SSH Kab. Sarolangun 2024 | Meter | 35.000 |
108 | Kawat Sling Jembatan Gantung D. 1/2" | ZONA II | SSH Kab. Sarolangun 2024 | Meter | 31.000 |
109 | Kawat Sling Jembatan Gantung D. 1/2" | ZONA I | SSH Kab. Sarolangun 2024 | Meter | 27.000 |
110 | Kawat Sling Jembatan Gantung D. 3/4" | ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 86.000 |
111 | Kawat Sling Jembatan Gantung D. 3/4" | ZONA III | SSH Kab. Sarolangun 2024 | Meter | 75.000 |
112 | Kawat Sling Jembatan Gantung D. 3/4" | ZONA II | SSH Kab. Sarolangun 2024 | Meter | 66.000 |
113 | Kawat Sling Jembatan Gantung D. 3/4" | ZONA I | SSH Kab. Sarolangun 2024 | Meter | 58.000 |
114 | Kawat Sling Jembatan Gantung D. 1" | ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 142.000 |
115 | Kawat Sling Jembatan Gantung D. 1" | ZONA III | SSH Kab. Sarolangun 2024 | Meter | 132.000 |
116 | Kawat Sling Jembatan Gantung D. 1" | ZONA II | SSH Kab. Sarolangun 2024 | Meter | 123.000 |
117 | Kawat Sling Jembatan Gantung D. 1" | ZONA I | SSH Kab. Sarolangun 2024 | Meter | 114.000 |
118 | Kawat Sling Jembatan Gantung D. 1.1/4" | ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 224.000 |
119 | Kawat Sling Jembatan Gantung D. 1.1/4" | ZONA III | SSH Kab. Sarolangun 2024 | Meter | 208.000 |
120 | Kawat Sling Jembatan Gantung D. 1.1/4" | ZONA II | SSH Kab. Sarolangun 2024 | Meter | 193.000 |
121 | Kawat Sling Jembatan Gantung D. 1.1/4" | ZONA I | SSH Kab. Sarolangun 2024 | Meter | 179.000 |
122 | Kawat Sling Jembatan Gantung D. 1.1/2" | ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 268.000 |
123 | Kawat Sling Jembatan Gantung D. 1.1/2" | ZONA III | SSH Kab. Sarolangun 2024 | Meter | 249.000 |
124 | Kawat Sling Jembatan Gantung D. 1.1/2" | ZONA II | SSH Kab. Sarolangun 2024 | Meter | 231.000 |
125 | Kawat Sling Jembatan Gantung D. 1.1/2" | ZONA I | SSH Kab. Sarolangun 2024 | Meter | 214.000 |
126 | Kawat harmonika Galvanis Uk. 50 x 50 cm | ZONA IV | SSH Kab. Sarolangun 2024 | M2 | 128.000 |
127 | Kawat harmonika Galvanis Uk. 50 x 50 cm | ZONA III | SSH Kab. Sarolangun 2024 | M2 | 112.000 |
128 | Kawat harmonika Galvanis Uk. 50 x 50 cm | ZONA II | SSH Kab. Sarolangun 2024 | M2 | 98.000 |
129 | Kawat harmonika Galvanis Uk. 50 x 50 cm | ZONA I | SSH Kab. Sarolangun 2024 | M2 | 85.500 |
130 | Kawat duri Galvanis | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 46.000 |
131 | Kawat duri Galvanis | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 40.000 |
132 | Kawat duri Galvanis | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 35.000 |
133 | Kawat duri Galvanis | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 31.000 |
134 | Kawat Bronjong Pabrikasi uk 3 mm ( 10x12 cm) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 600.000 |
135 | Kawat Bronjong Pabrikasi uk 3 mm ( 10x12 cm) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 570.000 |
136 | Kawat Bronjong Pabrikasi uk 3 mm ( 10x12 cm) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 540.000 |
137 | Kawat Bronjong Pabrikasi uk 3 mm ( 10x12 cm) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 510.000 |
138 | Kawat Bronjong Pabrikasi uk 3 mm ( 8x10 cm) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 610.000 |
139 | Kawat Bronjong Pabrikasi uk 3 mm ( 8x10 cm) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 590.000 |
140 | Kawat Bronjong Pabrikasi uk 3 mm ( 8x10 cm) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 560.000 |
141 | Kawat Bronjong Pabrikasi uk 3 mm ( 8x10 cm) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 530.000 |
142 | Kawat Bronjong Pabrikasi uk 2,7 mm ( 10x12 cm) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 500.000 |
143 | Kawat Bronjong Pabrikasi uk 2,7 mm ( 10x12 cm) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 455.000 |
144 | Kawat Bronjong Pabrikasi uk 2,7 mm ( 10x12 cm) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 450.000 |
145 | Kawat Bronjong Pabrikasi uk 2,7 mm ( 10x12 cm) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 400.000 |
146 | Kawat Bronjong Pabrikasi uk 2,7 mm ( 8x10 cm) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 472.500 |
147 | Kawat Bronjong Pabrikasi uk 2,7 mm ( 8x10 cm) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 472.500 |
148 | Kawat Bronjong Pabrikasi uk 2,7 mm ( 8x10 cm) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 472.500 |
149 | Kawat Bronjong Pabrikasi uk 2,7 mm ( 8x10 cm) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 420.000 |
150 | Kawat bronjong galvanis (Pabrikasi) | ZONA IV | SSH Kab. Sarolangun 2024 | Unit | 500.000 |
151 | Kawat bronjong galvanis (Pabrikasi) | ZONA III | SSH Kab. Sarolangun 2024 | Unit | 455.000 |
152 | Kawat bronjong galvanis (Pabrikasi) | ZONA II | SSH Kab. Sarolangun 2024 | Unit | 450.000 |
153 | Kawat bronjong galvanis (Pabrikasi) | ZONA I | SSH Kab. Sarolangun 2024 | Unit | 400.000 |
154 | Besi hollow 60x60x2 mm | ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 110.000 |
155 | Besi hollow 60x60x2 mm | ZONA III | SSH Kab. Sarolangun 2024 | Meter | 96.000 |
156 | Besi hollow 60x60x2 mm | ZONA II | SSH Kab. Sarolangun 2024 | Meter | 84.000 |
157 | Besi hollow 60x60x2 mm | ZONA I | SSH Kab. Sarolangun 2024 | Meter | 73.500 |
158 | Besi hollow 50x50x2 mm | ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 98.000 |
159 | Besi hollow 50x50x2 mm | ZONA III | SSH Kab. Sarolangun 2024 | Meter | 86.000 |
160 | Besi hollow 50x50x2 mm | ZONA II | SSH Kab. Sarolangun 2024 | Meter | 75.000 |
161 | Besi hollow 50x50x2 mm | ZONA I | SSH Kab. Sarolangun 2024 | Meter | 66.000 |
162 | Besi hollow 40x40x2 mm | ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 65.000 |
163 | Besi hollow 40x40x2 mm | ZONA III | SSH Kab. Sarolangun 2024 | Meter | 57.000 |
164 | Besi hollow 40x40x2 mm | ZONA II | SSH Kab. Sarolangun 2024 | Meter | 50.000 |
165 | Besi hollow 40x40x2 mm | ZONA I | SSH Kab. Sarolangun 2024 | Meter | 44.000 |
166 | Besi hollow 30x30x1.4 mm | ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 47.000 |
167 | Besi hollow 30x30x1.4 mm | ZONA III | SSH Kab. Sarolangun 2024 | Meter | 36.000 |
168 | Besi hollow 30x30x1.4 mm | ZONA II | SSH Kab. Sarolangun 2024 | Meter | 32.000 |
169 | Besi hollow 30x30x1.4 mm | ZONA I | SSH Kab. Sarolangun 2024 | Meter | 31.500 |
170 | Besi hollow 20x20x1.4 mm | ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 41.000 |
171 | Besi hollow 20x20x1.4 mm | ZONA III | SSH Kab. Sarolangun 2024 | Meter | 36.000 |
172 | Besi hollow 20x20x1.4 mm | ZONA II | SSH Kab. Sarolangun 2024 | Meter | 32.000 |
173 | Besi hollow 20x20x1.4 mm | ZONA I | SSH Kab. Sarolangun 2024 | Meter | 28.000 |
174 | Profil aluminium | ZONA IV | SSH Kab. Sarolangun 2024 | Meter | 112.375 |
175 | Profil aluminium | ZONA III | SSH Kab. Sarolangun 2024 | Meter | 107.050 |
176 | Profil aluminium | ZONA II | SSH Kab. Sarolangun 2024 | Meter | 89.125 |
177 | Profil aluminium | ZONA I | SSH Kab. Sarolangun 2024 | Meter | 77.500 |
178 | Besi tempa | ZONA IV | SSH Kab. Sarolangun 2024 | M2 | 690.000 |
179 | Besi tempa | ZONA III | SSH Kab. Sarolangun 2024 | M2 | 640.000 |
180 | Besi tempa | ZONA II | SSH Kab. Sarolangun 2024 | M2 | 590.000 |
181 | Besi tempa | ZONA I | SSH Kab. Sarolangun 2024 | M2 | 540.000 |
182 | Besi plat rata-rata | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 25.000 |
183 | Besi plat rata-rata | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 22.000 |
184 | Besi plat rata-rata | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 19.000 |
185 | Besi plat rata-rata | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 17.000 |
186 | Baja Struktur | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 63.000 |
187 | Baja Struktur | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 55.000 |
188 | Baja Struktur | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 48.000 |
189 | Baja Struktur | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 42.000 |
190 | Rangka atap baja ringan reng | Galvanum; ukuran 35x45 Zona IV | SSH Kab. Sarolangun 2024 | M2 | 237.000 |
191 | Rangka atap baja ringan reng | Galvanum; ukuran 35x45 Zona III | SSH Kab. Sarolangun 2024 | M2 | 213.000 |
192 | Rangka atap baja ringan reng | Galvanum; ukuran 35x45 Zona II | SSH Kab. Sarolangun 2024 | M2 | 189.000 |
193 | Rangka atap baja ringan reng | Galvanum; ukuran 35x45 Zona I | SSH Kab. Sarolangun 2024 | M2 | 165.000 |
194 | Rangka atap baja ringan kaso | Galvanum; ukuran 75x75 Zona IV | SSH Kab. Sarolangun 2024 | M2 | 203.000 |
195 | Rangka atap baja ringan kaso | Galvanum; ukuran 75x75 Zona III | SSH Kab. Sarolangun 2024 | M2 | 182.000 |
196 | Rangka atap baja ringan kaso | Galvanum; ukuran 75x75 Zona II | SSH Kab. Sarolangun 2024 | M2 | 161.000 |
197 | Rangka atap baja ringan kaso | Galvanum; ukuran 75x75 Zona I | SSH Kab. Sarolangun 2024 | M2 | 140.000 |
198 | Baja ringan/ Steel Truss C.75.55 | Smart truss; Prima truss; p. 6 m ZONA IV | SSH Kab. Sarolangun 2024 | Batang | 168.000 |
199 | Baja ringan/ Steel Truss C.75.55 | Smart truss; Prima truss; p. 6 m ZONA III | SSH Kab. Sarolangun 2024 | Batang | 156.000 |
200 | Baja ringan/ Steel Truss C.75.55 | Smart truss; Prima truss; p. 6 m ZONA II | SSH Kab. Sarolangun 2024 | Batang | 140.000 |
201 | Baja ringan/ Steel Truss C.75.55 | Smart truss; Prima truss; p. 6 m ZONA I | SSH Kab. Sarolangun 2024 | Batang | 132.000 |
202 | Baja ringan/ Steel Truss C.75.75 | Smart truss; Prima truss; p. 6 m ZONA IV | SSH Kab. Sarolangun 2024 | Batang | 210.000 |
203 | Baja ringan/ Steel Truss C.75.75 | Smart truss; Prima truss; p. 6 m ZONA III | SSH Kab. Sarolangun 2024 | Batang | 194.000 |
204 | Baja ringan/ Steel Truss C.75.75 | Smart truss; Prima truss; p. 6 m ZONA II | SSH Kab. Sarolangun 2024 | Batang | 180.000 |
205 | Baja ringan/ Steel Truss C.75.75 | Smart truss; Prima truss; p. 6 m ZONA I | SSH Kab. Sarolangun 2024 | Batang | 168.500 |
206 | Kawat beton | Diameter 8 ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 48.000 |
207 | Kawat beton | Diameter 8 ZONA III | SSH Kab. Sarolangun 2024 | Kg | 42.000 |
208 | Kawat beton | Diameter 8 ZONA II | SSH Kab. Sarolangun 2024 | Kg | 37.000 |
209 | Kawat beton | Diameter 8 ZONA I | SSH Kab. Sarolangun 2024 | Kg | 32.000 |
210 | Kawat beton | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 70.903 |
211 | Kawat beton | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 61.654 |
212 | Kawat beton | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 53.613 |
213 | Kawat beton | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 46.620 |
214 | Kawat beton | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 47.000 |
215 | Kawat beton | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 41.000 |
216 | Kawat beton | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 36.000 |
217 | Kawat beton | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 32.000 |
218 | Besi beton U-32 Ulir | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 31.000 |
219 | Besi beton U-32 Ulir | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 27.000 |
220 | Besi beton U-32 Ulir | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 24.000 |
221 | Besi beton U-32 Ulir | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 21.000 |
222 | Besi beton U-32 Polos | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 28.000 |
223 | Besi beton U-32 Polos | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 25.000 |
224 | Besi beton U-32 Polos | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 22.000 |
225 | Besi beton U-32 Polos | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 18.500 |
226 | Besi beton U-24 Polos | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 26.000 |
227 | Besi beton U-24 Polos | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 23.000 |
228 | Besi beton U-24 Polos | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 20.000 |
229 | Besi beton U-24 Polos | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 18.000 |
230 | Penutup plastik hitam | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 12.000 |
231 | Penutup plastik hitam | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 10.000 |
232 | Penutup plastik hitam | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 9.000 |
233 | Penutup plastik hitam | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 8.000 |
234 | Aspal (Shell) | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 33.000 |
235 | Aspal (Shell) | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 29.000 |
236 | Aspal (Shell) | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 26.000 |
237 | Aspal (Shell) | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 23.000 |
238 | Aspal (Elmusi) | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 33.000 |
239 | Aspal (Elmusi) | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 29.000 |
240 | Aspal (Elmusi) | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 26.000 |
241 | Aspal (Elmusi) | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 23.000 |
242 | Aspal (Pertamina) | ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 33.000 |
243 | Aspal (Pertamina) | ZONA III | SSH Kab. Sarolangun 2024 | Kg | 29.000 |
244 | Aspal (Pertamina) | ZONA II | SSH Kab. Sarolangun 2024 | Kg | 26.000 |
245 | Aspal (Pertamina) | ZONA I | SSH Kab. Sarolangun 2024 | Kg | 23.000 |
246 | Semen warna | Semen Indonesia ZONA IV | SSH Kab. Sarolangun 2024 | Kg | 48.000 |
247 | Semen warna | Semen Indonesia ZONA III | SSH Kab. Sarolangun 2024 | Kg | 42.500 |
248 | Semen warna | Semen Indonesia ZONA II | SSH Kab. Sarolangun 2024 | Kg | 37.000 |
249 | Semen warna | Semen Indonesia ZONA I | SSH Kab. Sarolangun 2024 | Kg | 32.500 |
250 | Semen (50 kg) | Semen Indonesia ZONA IV (Khusus SDA) | SSH Kab. Sarolangun 2024 | Zak | 175.000 |
251 | Semen (50 kg) | Semen Indonesia ZONA IV | SSH Kab. Sarolangun 2024 | Zak | 140.000 |
252 | Semen (50 kg) | Semen Indonesia ZONA III (Khusus SDA) | SSH Kab. Sarolangun 2024 | Zak | 125.000 |
253 | Semen (50 kg) | Semen Indonesia ZONA III | SSH Kab. Sarolangun 2024 | Zak | 120.000 |
254 | Semen (50 kg) | Semen Indonesia ZONA II (Khusus SDA) | SSH Kab. Sarolangun 2024 | Zak | 100.000 |
255 | Semen (50 kg) | Semen Indonesia ZONA II | SSH Kab. Sarolangun 2024 | Zak | 89.000 |
256 | Semen (50 kg) | Semen Indonesia ZONA I | SSH Kab. Sarolangun 2024 | Zak | 85.000 |
257 | Conblok Uk. 10.5x21x10 | ZONA IV | SSH Kab. Sarolangun 2024 | M2 | 209.000 |
258 | Conblok Uk. 10.5x21x10 | ZONA III | SSH Kab. Sarolangun 2024 | M2 | 194.000 |
259 | Conblok Uk. 10.5x21x10 | ZONA II | SSH Kab. Sarolangun 2024 | M2 | 180.000 |
260 | Conblok Uk. 10.5x21x10 | ZONA I | SSH Kab. Sarolangun 2024 | M2 | 165.000 |
261 | Conblok Uk. 10.5x21x6 | ZONA IV | SSH Kab. Sarolangun 2024 | M2 | 145.000 |
262 | Conblok Uk. 10.5x21x6 | ZONA III | SSH Kab. Sarolangun 2024 | M2 | 135.000 |
263 | Conblok Uk. 10.5x21x6 | ZONA II | SSH Kab. Sarolangun 2024 | M2 | 125.000 |
264 | Conblok Uk. 10.5x21x6 | ZONA I | SSH Kab. Sarolangun 2024 | M2 | 115.000 |
265 | Gabalan Rumput | ZONA IV | SSH Kab. Sarolangun 2024 | M2 | 99.000 |
266 | Gabalan Rumput | ZONA III | SSH Kab. Sarolangun 2024 | M2 | 92.000 |
267 | Gabalan Rumput | ZONA II | SSH Kab. Sarolangun 2024 | M2 | 86.000 |
268 | Gabalan Rumput | ZONA I | SSH Kab. Sarolangun 2024 | M2 | 80.000 |
269 | Abu batu | ZONA IV | SSH Kab. Sarolangun 2024 | M2 | 270.000 |
270 | Abu batu | ZONA III | SSH Kab. Sarolangun 2024 | M2 | 250.000 |
271 | Abu batu | ZONA II | SSH Kab. Sarolangun 2024 | M2 | 232.000 |
272 | Abu batu | ZONA I | SSH Kab. Sarolangun 2024 | M2 | 215.000 |
273 | Tanah urug | ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 125.000 |
274 | Tanah urug | ZONA III | SSH Kab. Sarolangun 2024 | M3 | 116.000 |
275 | Tanah urug | ZONA II | SSH Kab. Sarolangun 2024 | M3 | 108.000 |
276 | Tanah urug | ZONA I | SSH Kab. Sarolangun 2024 | M3 | 100.000 |
277 | Pasir urug | ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 213.000 |
278 | Pasir urug | ZONA III | SSH Kab. Sarolangun 2024 | M3 | 198.000 |
279 | Pasir urug | ZONA II | SSH Kab. Sarolangun 2024 | M3 | 184.000 |
280 | Pasir urug | ZONA I | SSH Kab. Sarolangun 2024 | M3 | 170.000 |
281 | Pasir pasang | ZONA IV (Khusus SDA) | SSH Kab. Sarolangun 2024 | M3 | 350.000 |
282 | Pasir pasang | ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 226.000 |
283 | Pasir pasang | ZONA III (Khusus SDA) | SSH Kab. Sarolangun 2024 | M3 | 325.000 |
284 | Pasir pasang | ZONA III | SSH Kab. Sarolangun 2024 | M3 | 209.000 |
285 | Pasir pasang | ZONA II (Khusus SDA) | SSH Kab. Sarolangun 2024 | M3 | 250.000 |
286 | Pasir pasang | ZONA II | SSH Kab. Sarolangun 2024 | M3 | 194.000 |
287 | Pasir pasang | ZONA I | SSH Kab. Sarolangun 2024 | M3 | 180.000 |
288 | Pasir beton | ZONA IV (Khusus SDA) | SSH Kab. Sarolangun 2024 | M3 | 350.000 |
289 | Pasir beton | ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 226.000 |
290 | Pasir beton | ZONA III (Khusus SDA) | SSH Kab. Sarolangun 2024 | M3 | 325.000 |
291 | Pasir beton | ZONA III | SSH Kab. Sarolangun 2024 | M3 | 209.000 |
292 | Pasir beton | ZONA II (Khusus SDA) | SSH Kab. Sarolangun 2024 | M3 | 250.000 |
293 | Pasir beton | ZONA II | SSH Kab. Sarolangun 2024 | M3 | 194.000 |
294 | Pasir beton | ZONA I | SSH Kab. Sarolangun 2024 | M3 | 180.000 |
295 | Sirtu | ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 213.000 |
296 | Sirtu | ZONA III | SSH Kab. Sarolangun 2024 | M3 | 198.000 |
297 | Sirtu | ZONA II | SSH Kab. Sarolangun 2024 | M3 | 184.000 |
298 | Sirtu | ZONA I | SSH Kab. Sarolangun 2024 | M3 | 170.000 |
299 | Batu Kerikil | ZONA IV (Khusus SDA) | SSH Kab. Sarolangun 2024 | M3 | 350.000 |
300 | Batu Kerikil | ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 274.000 |
301 | Batu Kerikil | ZONA III (Khusus SDA) | SSH Kab. Sarolangun 2024 | M3 | 325.000 |
302 | Batu Kerikil | ZONA III | SSH Kab. Sarolangun 2024 | M3 | 254.000 |
303 | Batu Kerikil | ZONA II (Khusus SDA) | SSH Kab. Sarolangun 2024 | M3 | 250.000 |
304 | Batu Kerikil | ZONA II | SSH Kab. Sarolangun 2024 | M3 | 235.000 |
305 | Batu Kerikil | ZONA I | SSH Kab. Sarolangun 2024 | M3 | 190.000 |
306 | Batu split pecah mesin 3/5 | ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 695.000 |
307 | Batu split pecah mesin 3/5 | ZONA III | SSH Kab. Sarolangun 2024 | M3 | 645.000 |
308 | Batu split pecah mesin 3/5 | ZONA II | SSH Kab. Sarolangun 2024 | M3 | 595.000 |
309 | Batu split pecah mesin 3/5 | ZONA I | SSH Kab. Sarolangun 2024 | M3 | 545.000 |
310 | Batu split pecah mesin 2/3 | ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 700.000 |
311 | Batu split pecah mesin 2/3 | ZONA III | SSH Kab. Sarolangun 2024 | M3 | 650.000 |
312 | Batu split pecah mesin 2/3 | ZONA II | SSH Kab. Sarolangun 2024 | M3 | 600.000 |
313 | Batu split pecah mesin 2/3 | ZONA I | SSH Kab. Sarolangun 2024 | M3 | 550.000 |
314 | Batu split pecah mesin 1/2 | ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 705.000 |
315 | Batu split pecah mesin 1/2 | ZONA III | SSH Kab. Sarolangun 2024 | M3 | 655.000 |
316 | Batu split pecah mesin 1/2 | ZONA II | SSH Kab. Sarolangun 2024 | M3 | 605.000 |
317 | Batu split pecah mesin 1/2 | ZONA I | SSH Kab. Sarolangun 2024 | M3 | 555.000 |
318 | Batu kali | batu belah pondasi ZONA IV | SSH Kab. Sarolangun 2024 | M3 | 550.000 |
319 | Batu kali | batu belah pondasi ZONA III | SSH Kab. Sarolangun 2024 | M3 | 485.000 |
320 | Batu kali | batu belah pondasi ZONA II | SSH Kab. Sarolangun 2024 | M3 | 435.000 |
321 | Batu kali | batu belah pondasi ZONA I | SSH Kab. Sarolangun 2024 | M3 | 385.000 |
322 | Glassblok | uk. 19x19x19 mm ZONA IV | SSH Kab. Sarolangun 2024 | Buah | 54.000 |
323 | Glassblok | uk. 19x19x19 mm ZONA III | SSH Kab. Sarolangun 2024 | Buah | 47.000 |
324 | Glassblok | uk. 19x19x19 mm ZONA II | SSH Kab. Sarolangun 2024 | Buah | 41.000 |
325 | Glassblok | uk. 19x19x19 mm ZONA I | SSH Kab. Sarolangun 2024 | Buah | 36.000 |
326 | Bata beton ringan ex Celcon | uk. 60x20x7,5 ZONA IV | SSH Kab. Sarolangun 2024 | Buah | 20.000 |
327 | Bata beton ringan ex Celcon | uk. 60x20x7,5 cm ZONA III | SSH Kab. Sarolangun 2024 | Buah | 18.000 |
328 | Bata beton ringan ex Celcon | uk. 60x20x7,5 cm ZONA II | SSH Kab. Sarolangun 2024 | Buah | 16.000 |
329 | Bata beton ringan ex Celcon | uk. 60x20x7,5 cm ZONA I | SSH Kab. Sarolangun 2024 | Buah | 14.000 |
330 | Bata Merah | uk. 5x11x22 cm ZONA IV | SSH Kab. Sarolangun 2024 | Buah | 1.000 |
331 | Bata Merah | uk. 5x11x22 cm ZONA III | SSH Kab. Sarolangun 2024 | Buah | 900 |
332 | Bata Merah | uk. 5x11x22 cm ZONA II | SSH Kab. Sarolangun 2024 | Buah | 800 |
333 | Bata Merah | uk. 5x11x22 cm ZONA I | SSH Kab. Sarolangun 2024 | Buah | 700 |
334 | Gorong-gorong D. 20 cm | (dengan tulangan) | SSH Kab. Sarolangun 2024 | Buah | 170.000 |
335 | Gorong-gorong D. 30 cm | (dengan tulangan) | SSH Kab. Sarolangun 2024 | Buah | 210.000 |
336 | Gorong-gorong D. 40 cm | (dengan tulangan) | SSH Kab. Sarolangun 2024 | Buah | 350.000 |
337 | Gorong-gorong D. 60 cm | (dengan tulangan) | SSH Kab. Sarolangun 2024 | Buah | 450.000 |
338 | Gorong-gorong D. 80 cm | (dengan tulangan) | SSH Kab. Sarolangun 2024 | Buah | 550.000 |
339 | Gorong-gorong D. 100 cm | (dengan tulangan) | SSH Kab. Sarolangun 2024 | Buah | 600.000 |
340 | Gorong-gorong D. 130 cm | (dengan tulangan) | SSH Kab. Sarolangun 2024 | Buah | 700.000 |
341 | Gorong-gorong D. 150 cm | (dengan tulangan) | SSH Kab. Sarolangun 2024 | Buah | 800.000 |
342 | Gorong-gorong D. 180 cm | (dengan tulangan) | SSH Kab. Sarolangun 2024 | Buah | 1.000.000 |
343 | Gorong-gorong D. 200 cm | (dengan tulangan) | SSH Kab. Sarolangun 2024 | Buah | 1.100.000 |
344 | Gorong Plat Baja dia 1m | Diameter 1 M | SSH Kab. Sarolangun 2024 | M1 | 3.200.000 |
345 | Stick Parkir Lalu Lintas | Stick Parkir Lalu Lintas | SSH Kab. Sarolangun 2024 | Buah | 150.000 |
346 | Road Barrier | Road Barrier | SSH Kab. Sarolangun 2024 | Buah | 1.500.000 |
347 | Traffic Cone | Traffic Cone | SSH Kab. Sarolangun 2024 | Buah | 250.000 |
348 | APD Konstruksi (Sarung Tangan) | APD Konstruksi (Sarung Tangan) | SSH Kab. Sarolangun 2024 | Pcs | 35.000 |
349 | APD Konstruksi (Sepatu Boot) | APD Konstruksi (Sepatu Boot) | SSH Kab. Sarolangun 2024 | Pcs | 100.000 |
350 | APD Konstruksi (Helm) | APD Konstruksi (Helm) | SSH Kab. Sarolangun 2024 | Pcs | 50.000 |
351 | APD Konstruksi (Rompi) | APD Konstruksi (Rompi) | SSH Kab. Sarolangun 2024 | Pcs | 60.000 |
352 | Semen 50 Kg | 50 Kg | SSH Kab. Sarolangun 2024 | Zak | 85.000 |
353 | Gas EPG 12 Kg | 12 Kg | SSH Kab. Sarolangun 2024 | Tabung | 280.000 |
354 | Aspal Curah @20 kg | 20 Kg | SSH Kab. Sarolangun 2024 | Buah | 550.000 |
355 | Aspal Dingin | Aspal Dingin | SSH Kab. Sarolangun 2024 | Ton | 1.800.000 |
356 | Karung Plastik Ukuran 30 Kg | 30 Kg | SSH Kab. Sarolangun 2024 | Lembar | 2.000 |
357 | Kayu Dolken/ Kelam 3"- 5" | 3"-5" | SSH Kab. Sarolangun 2024 | Batang | 40.000 |
358 | Baut Latai 8 mm | 8 mm | SSH Kab. Sarolangun 2024 | Buah | 2.500 |
359 | Gorong Plat Baja dia 1m | Diameter 1 M | SSH Kab. Sarolangun 2024 | M1 | 3.200.000 |
360 | Pasir | ZONA I | SSH Kab. Sarolangun 2024 | M3 | 180.000 |
361 | KABEL SR | LPJU | SSH Kab. Sarolangun 2024 | Meter | 10.000 |
362 | KABEL NYY 4 X 4 MM | LPJU | SSH Kab. Sarolangun 2024 | Meter | 67.500 |
363 | KABEL NYA 1 X 1,5 MM | LPJU | SSH Kab. Sarolangun 2024 | Meter | 10.000 |
364 | KABEL NYM 2X 2,5 MM | LPJU | SSH Kab. Sarolangun 2024 | Meter | 17.500 |
365 | KABEL NYYREBY 4X4 MM | LPJU | SSH Kab. Sarolangun 2024 | Meter | 125.000 |
366 | REL AKTIF | LPJU | SSH Kab. Sarolangun 2024 | Buah | 56.250 |
367 | SCON 10 MM | LPJU | SSH Kab. Sarolangun 2024 | Buah | 18.750 |
368 | REL ALUMUNIUM | LPJU | SSH Kab. Sarolangun 2024 | Buah | 156.250 |
369 | CONEX | LPJU | SSH Kab. Sarolangun 2024 | Buah | 62.500 |
370 | POTOCEL | LPJU | SSH Kab. Sarolangun 2024 | Buah | 87.500 |
371 | TIMER SET | LPJU | SSH Kab. Sarolangun 2024 | Buah | 562.500 |
372 | CONTAKTOR | LPJU | SSH Kab. Sarolangun 2024 | Buah | 1.062.500 |
373 | MCCB | LPJU | SSH Kab. Sarolangun 2024 | Buah | 875.000 |
374 | MCB 30 AMPERE | LPJU | SSH Kab. Sarolangun 2024 | Buah | 125.000 |
375 | TRAVO LED 50 WATT | LPJU | SSH Kab. Sarolangun 2024 | Buah | 100.000 |
376 | BOLA LED 50 WATT | LPJU | SSH Kab. Sarolangun 2024 | Buah | 100.000 |
377 | ISOLASI BIASA | LPJU | SSH Kab. Sarolangun 2024 | Buah | 25.000 |
378 | STAINLEST STRIP | LPJU | SSH Kab. Sarolangun 2024 | Buah | 250.000 |
379 | SKOT | LPJU | SSH Kab. Sarolangun 2024 | Buah | 56.250 |
380 | KLEM TARIK | LPJU | SSH Kab. Sarolangun 2024 | Buah | 37.500 |
381 | SUSPENSION LISTRIK | LPJU | SSH Kab. Sarolangun 2024 | Buah | 31.250 |
382 | ISOLASI BAKAR / SELONGSONG BAKAR | LPJU | SSH Kab. Sarolangun 2024 | Buah | 37.500 |
383 | FITTING LAMPU | LPJU | SSH Kab. Sarolangun 2024 | Buah | 150.000 |
384 | INJEKTOR LISTRIK | LPJU | SSH Kab. Sarolangun 2024 | Buah | 100.000 |
385 | TRAVO | LPJU | SSH Kab. Sarolangun 2024 | Buah | 406.250 |
386 | KAPASITOR | LPJU | SSH Kab. Sarolangun 2024 | Buah | 100.000 |
387 | BOLA SON-T 150 WATT | LPJU | SSH Kab. Sarolangun 2024 | Buah | 250.000 |